Homebrewing Beer with (Vision 130 ) Now V700!

Recommended Posts

Hi Everyone

I thought I would add my latest Unitronics project to the list here.

I am using a V130 with expanded IO to control a home brewing system. It controls all valves depending on process step, pumps, burners, PID temp control, etc.

The V130 (and Visilogic) is awesome.

Will be further automating the system as I learn more about data-tables, trending, and a ton of other items.

You can see pics of the build here:

http://webpages.charter.net/wscovell/

It's a work in progress so stay tuned.

Thanks!

Bill

Share this post


Link to post
Share on other sites

I know how much there is to learn and am opening a Nano brewery in Alabama and am using a v120 for my plc. I was wondering if you already knew about ladder logic before you started this project or if you learned it as you went? I have been playing with mine for about a month, but I have no training whatsoever and it is frustrating to say the least. if possible, would love to here how you went about it and I may even need your help if you wouldnt mind sharing what you have learned.

Thanks, Derrell

Chattahoochee Brewing Co., LLC

Share this post


Link to post
Share on other sites

Hi Everyone

I thought I would add my latest Unitronics project to the list here.

I am using a V130 with expanded IO to control a home brewing system. It controls all valves depending on process step, pumps, burners, PID temp control, etc.

The V130 (and Visilogic) is awesome.

Will be further automating the system as I learn more about data-tables, trending, and a ton of other items.

You can see pics of the build here:

http://webpages.charter.net/wscovell/

It's a work in progress so stay tuned.

Thanks!

Bill

Bill I was wondering if you might be able to share your programs with me I am looking it to starting a little home brew set up and would love any info you could give..

Thank Bob

Share this post


Link to post
Share on other sites

I know how much there is to learn and am opening a Nano brewery in Alabama and am using a v120 for my plc. I was wondering if you already knew about ladder logic before you started this project or if you learned it as you went? I have been playing with mine for about a month, but I have no training whatsoever and it is frustrating to say the least. if possible, would love to here how you went about it and I may even need your help if you wouldnt mind sharing what you have learned.

Thanks, Derrell

Chattahoochee Brewing Co., LLC

Hi Darrell,

Let me introduce myself, my name is Holly Dillon and I'm the Regional Marketing Manager for Unitronics, Inc. in the US. As you may be aware, we do have various webinars available for viewing on our website (http://www.unitronic...x?page=webinars). We also training seminars that take place around the nation. At the moment the only seminar for beginners will be held in Boston (11/30-12/2). If you would like to be added to our newsletter to be notified of future trainings, please let me know. Some of the cities slated for 2012 trainings include: Anaheim, CA; Philadelphia, PA; Ft. Worth, TX; Tampa, FL; Boston, MA; Pittsburgh, PA; Chicago, IL. I hope you find this information helpful and please let me know if there is anything else I can do to help.

Best regards,

Holly Dillon

617-657-6596 x7906

Share this post


Link to post
Share on other sites

Well, here it is four years later. 

 

So I am now working setting up my home brewery with a V290. I am adding several new sensors, mostly flow sensors to meter out HL water, and to balance sparge flow vs lauter flow. I am now using the drum sequencer function block to automate the individual process steps, mash rake, and hop addition alerts.Will be using an additional PID loop to control a proportional valve for lauter/sparge balance.

Will use another PID loop with proportional valve for chill water flow to regulate chilled output temp to fermenter.

 

I will get some pics of the system up here when I can get a chance.

 

The original system has been working great, now I just want to go to the next level in automating the process. I am also working on a large screen HMI to show the entire process and status using Advanced HMI.

I hope to upgrade to something like the V700, or at least the V430 when funds permit.

 

That's all for now!

 

Bill

Share this post


Link to post
Share on other sites

Here is the latest brewing system controller ready to install on system. Still a lot of work to do, have to build the recipe data tables and interface screen(s), and configure timers, or drum sequncers to automate the individual functions. As always a work in progress!

 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...