Jump to content

Flu0w

Members
  • Posts

    1
  • Joined

  • Last visited

Flu0w's Achievements

Newbie

Newbie (1/4)

0

Reputation

  1. Hello everyone, This is my first message on the UniForum, and I'm a frenchie, so sorry for bad english. There is a limit on a number of schedule modules in an unistream program ? I made a program to manage a boiler room. I have multiple schedules to modulate the temperature (day, night ect.) and schedule to pilot an lighting extinction from 9pm to 6am Sometimes, the clock of the PLC stops at 8pm 59minutes. (1 sec before my lighting extinction schedule) Everything elese in the program work great, all my PID in the program works, ect. BUT, the plc clock is stopped, so my schedules are also freezed (sorry if the expression is wrong). If I go to the UniApps, I can see the clock is been stopped, if I click on it, and I try to change date/time, the PLC don't apply the new date/time, and I have no error message, and also no CPU bugs ect. If I want the PLC works again with my schedules I have to shutdown and restart. And magically everything comes back, with the correct date/time... So, I contact the french disributor of Unitronics (PLSystem), they ask me to do theses things : Update firmware to the latest version = Done, no ameliorations Download an empty project on the PLC and redownload the projet, and do some tests = Dome, no ameliorations Upload to them, the UniLog file, but they don't find any precious info in it. Last chance, change the PLC to a new one, but it's in production, we are in winter, it's not possible to stop boilers. So I have to wait May/June to do this. Maybe some of great and genious people here, can give me some indications, or solutions... I have something to tell you as well : i'm a begineer (I'm 25) in the Unitronics world. (I normally program Schneider PLC). Thanks to all. Florian.
×
×
  • Create New...