So, my aim is to control a pump.
Timer Counts down (t1) -----> pump ON for 'x' seconds ------> Timer Finishes, Pump turns off
When pump has turned off, 'pump interval' timer begins (t2)
When interval timer has finished counting down ---------> power goes to t3-------> pump ON for 'x' seconds'.
Essentially, im using many different timers for to control one pump.
T1 is for the first flooding zone for the pump
T2 is an interval timer, needed to stop flow of water, so indexing valve can re align.
T3 is for the second flooding zone for the pump
Any thoughts on a quick solution?
As always, thanks for your help guys!