m.n.nashed Posted May 12, 2016 Report Share Posted May 12, 2016 Hi, I have a device which is controlled by Samba plc. I need to check if I can add another program to the PLC. If I could do that the device can do his old job and the new required one. Thanks Link to comment Share on other sites More sharing options...
Alexander Posted May 12, 2016 Report Share Posted May 12, 2016 Only one program can be working in the controller at a time. If you have access to the program you can add additional code if the two tasks can be combined. Link to comment Share on other sites More sharing options...
arbellah Posted May 13, 2016 Report Share Posted May 13, 2016 You can add a subroutine and call the subroutine, but these ladders will not be independent. Link to comment Share on other sites More sharing options...
Paul Rylatt Posted May 13, 2016 Report Share Posted May 13, 2016 Create a .C13 clone file for each program, place in the System directory of a (micro) SD card and then the user can upload it from the SD card when it is time to change programs. They can even switch back and forth if they want to. If any user data has been saved in data tables, the user can save the data tables on the (micro) SD card when switching back and forth. The data table file can be downloaded to a PC for storage or even analyzed in software. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now